Risk based inspection programme
- 1500 Repairs identified and prioritised according to severity and risk assessment
- Specialist access techniques produced significant cost, time and safety benefits compared to traditional scaffolding.
Access systems utilised;
- Rope Access
- Lightweight Cradles
- Tension Netting
- Mobile Hop Up
Work elements included:
- Cleaning
- Surface Preparation
- Coating Application
Ability to re-locate to alternative locations at short notice to accommodate operational constraints without productivity losses
Provision of a safer, more flexible and competitive service.