
What goes up...must come down - safely and effectively.
AquaTerra's comprehensive construction and decommissioning capabilities provide our clients with a complete turnkey package for feasibility and assessment studies, planning, engineering, procurement and project execution in high or hazardous environments.
Our track record includes several technically challenging and high-profile projects in potentially hazardous environments requiring a broad range of NDT/Inspection, decommissioning and construction activities.
Whether it's a small replacement, repair work or a large-scale new build, our experienced and highly qualified personnel backed by a dedicated and competent management and engineering team, provide a recognised professional service.
We specialise in providing difficult access and hazardous environment construction and decommissioning solutions using rope access and tensioned netting systems.
The systems employed can be utilised with less visibility and impact than any other form of high access, resulting in greater project control with minimal disruption and, above all, increased safety for people and the environment.
Our operations management team offer valuable input at the Front End Engineering Design (FEED) stage to ensure the most cost-effective and safe alternative access methods reduce overall project lead time.
Solutions include:
- Rigging and Lifting
- Steelwork Erection
- Coded Welding
- Burning/ Grinding
- Plating
- Piece Small Dismantling
- Heavy Lift Preparation
- Hot and Cold cutting, Water Cutting
- Bolting
- Pipefitting
- NDT/Inspection
- Fabric Maintenance
